About Services Tools Blog Contact us

Trade Press Release Drafts

Drafts a short trade press release from a contract, project or show fact sheet, with a quote left for the spokesperson and a matching social caption when needed.

  • Copywriting & Text Generation
  • Water utilities
  • Agent skill
  • Productised
  • Hybrid
  • 2026

The problem

Announcements were written from scratch under deadline and then amended, although the structure is a standard trade note. The social caption for the same story was written separately. So it drifted from the release.

What it does

You fill in a fact sheet for a contract, project or show appearance. The draft follows the house structure: who appointed the contractor, what is being built or launched, and a quote left for the spokesperson. If a journal advert or social post runs with the story, that shorter line is written from the same facts.

Outcomes

  • A release starts from a fact sheet and not a blank page.
  • The quote is visibly unfilled until a person supplies it.
  • The caption matches the release because both come from the same facts.

Simplified mockup

Interactive preview with sample data. Nothing is sent to a server.

Trade release desk

Quote empty
Announcement facts Contract
House structure
  1. Headline
  2. Who appointed the contractor
  3. What is being built
  4. Value and timing
  5. Quote box left blank
  6. Caption and advert line
Facts loaded for PR-1841

Caption and advert

Same facts as the release
Social post 156 characters
Fenwick Water
Trade account · drafted, not posted

Fenwick Water has appointed Calder Holt to refurbish the Holt Fen pumping station: three storm pumps, a rising main and a standby generator, over 18 months.

Journal advert 19 words

Holt Fen pumping station. Calder Holt appointed for three storm pumps, the rising main and standby power. 18-month programme.

Held to the same scope as the release. An amend to paragraph two does not rewrite this line.

Drift check
FactReleaseCaptionAdvert
AppointerFenwick WaterFenwick Waterimplied
ContractorCalder HoltCalder HoltCalder Holt
WorksHolt Fen stationHolt Fen stationHolt Fen station
ScopePumps, main, generatorPumps, main, generatorPumps, main, power
QuotePlaceholderOmittedOmitted

Announcement bookings

This week
Fact sheets open
2
Quotes still empty
1
Filed this week
2
Fact sheet
PR-1841
Holt Fen pumping station
Contract · due 16:00
PR-1844
County show utilities stand
Show · stand C12
Quote due
PR-1836
Reedham rising main
Quote missing
Filed
PR-1822
Standby generator shed
Filed Tuesday
PR-1819
Storm pump spares framework
Filed Monday

How it works

  1. Capture the sector, the works or the show, and the contract scope on a fact sheet.
  2. Write the draft in a fixed shape: headline, three short paragraphs and a quote box.
  3. Mark the quote as a placeholder until the spokesperson fills it in.
  4. Write a social caption, and an advert line when needed, from the same facts.
  5. Shorten or correct the draft in an amend pass without starting again.

Pipeline

flowchart LR
  Facts[Fact sheet] --> Release[Headline and paragraphs]
  Release --> Quote[Quote placeholder]
  Quote --> Caption[Matching caption]
  Caption --> Amend[Amend pass]
  Amend --> File[File against the booking]