- Headline
- Who appointed the contractor
- What is being built
- Value and timing
- Quote box left blank
- Caption and advert line
Fenwick Water appoints Calder Holt for the Holt Fen pumping station
Fenwick Water has appointed Calder Holt to refurbish the Holt Fen pumping station. The contract covers three storm pumps, the rising main and a standby generator, and is programmed for 18 months.
The station serves the fen villages around Holt Fen and takes storm flows that currently spill onto low fields after heavy rain. Calder Holt will keep one duty pump running throughout the programme, phase the rising-main tie-ins around forecast dry windows, and reinstate the access track the operations team uses. Neighbours will see a temporary compound on the north boundary, with lorry deliveries kept off the school run.
The contract value is £4.2 million. Fenwick Water will name the start date once the compound licence is sealed.
Quote to follow from the operations director. This line must not be published until a person supplies it.
Fenwick Water has appointed Calder Holt to refurbish the Holt Fen pumping station: three storm pumps, a rising main and a standby generator, over 18 months.
Holt Fen pumping station. Calder Holt appointed for three storm pumps, the rising main and standby power. 18-month programme.
Fenwick Water has appointed Calder Holt to refurbish the Holt Fen pumping station: three storm pumps, a rising main and a standby generator, over 18 months.
Holt Fen pumping station. Calder Holt appointed for three storm pumps, the rising main and standby power. 18-month programme.
Held to the same scope as the release. An amend to paragraph two does not rewrite this line.
| Fact | Release | Caption | Advert |
|---|---|---|---|
| Appointer | Fenwick Water | Fenwick Water | implied |
| Contractor | Calder Holt | Calder Holt | Calder Holt |
| Works | Holt Fen station | Holt Fen station | Holt Fen station |
| Scope | Pumps, main, generator | Pumps, main, generator | Pumps, main, power |
| Quote | Placeholder | Omitted | Omitted |
Holt Fen pumping station
Contract · due 16:00
County show utilities stand
Show · stand C12
Reedham rising main
Quote missing
Standby generator shed
Filed Tuesday
Storm pump spares framework
Filed Monday