Mereside Process
Ready when it lands
Skid-built plant, commissioned in days.
Mereside Process
Ready when it lands
Skid-built plant, commissioned in days.
Mereside
Ready when it lands
Same art, resized. The headline and the short link travel with it.
Mereside Process
Ready when it lands
Skid-built plant, commissioned in days.
- Trim set to 210 × 297 mm
- Bleed set to 3 mm on all edges
- Headline and QR inside the safe area
- Photograph does not cover the bleed
The inside front and the 180 × 120 mm spot use this same file, so the shortfall is on every mechanical.
Plant that arrives ready to run
A skid-built plant, commissioned in days and tested before it leaves the workshop. The advertisement says the same.
Ready when it lands
Skid-built plant, commissioned in days.
go/plant
Headline, proof point and link agree| Publication | Slot | Trim | Deadline | Status |
|---|---|---|---|---|
| Civic Works Review | A4 page | 210 × 297 mm | 18 Mar | Proof filed |
| Treatment Monthly | Inside front | 210 × 297 mm | 02 Apr | With the journal |
| Plant Engineer | Spot well | 180 × 120 mm | 21 Apr | Artwork due |
| Harbour Engineering Forum | Spot well | 180 × 120 mm | 06 May | Copy agreed |