Posted dates are not rewritten. Open the copy desk for 16 September.
For the voiceover
Grey Scar covers 168 square kilometres of mapped ground. Drilling is underway on the first fence.
For the feed
Fellgate Minerals is working the Grey Scar land package, 168 square kilometres of mapped ground in the north of the licence. Drilling has started on the first fence. The spoken script beside this caption is the short version, for the video job to read later.
For the voiceover
The target at Grey Scar runs for 1.6 kilometres. Drilling is testing that length now.
For the feed
The Grey Scar programme is drilling a 1.6 kilometre target along the main structure. The spoken line uses the same length. Both should wait until the two distances are split apart.
The calendar draft says 168 square kilometres. The presentation and the website both say 142. The script and the caption used the draft.
Corrected sentence: Grey Scar covers 142 square kilometres of mapped ground.
1.6 kilometres is an older interpretation. The current target zone is 2.1 kilometres. They are not the same measurement, and the draft treats them as one.
Corrected sentence: the current target zone runs for 2.1 kilometres, and the older trend is stated separately at 1.6.
142 square kilometres is now in the spoken script and the longer caption. The video job can read the script. Nothing was posted, and the 2 September and 9 September lines were not rewritten.
The script and the caption now keep 2.1 kilometres as the current target and 1.6 kilometres as the older interpretation. Filed for the video job. Not posted.
| Date | Piece | Script | Caption | Status |
|---|---|---|---|---|
| 2 Sep | Rig arrival | Skipped | Skipped | Posted |
| 9 Sep | Core shed | Skipped | Skipped | Posted |
| 16 Sep | Land package | 2 sentences | Longer | Open |
| 23 Sep | Target length | 2 sentences | Longer | Open |
Accepting a correction files that date only. Posted dates stay skipped.