Résultats du forage d’hiver
24/08/2026 jour-mois-année
Fellside Metals a terminé six sondages sur le permis de Greycairn. Le meilleur intervalle mesure 12,4 mètres à 2,1 grammes par tonne. Le programme d’hiver est clos et les carottes sont au laboratoire d’analyse de High Gate.
Translated file removed. The extra download is gone and this is still the only news item.
Winter drill results
24 August 2026 English date
Fellside Metals has finished six holes on the Greycairn licence. The best intercept is 12.4 metres at 2.1 grams per tonne. The winter programme is closed and the core is at the High Gate assay laboratory.
2026-08-24-fr-release.pdf
The date and the language marker are read from the file name. It is not a new story.
Not a new story The French PDF hangs off this item. The feed still has one row.
| Path | English | Local edition | Date shown |
|---|---|---|---|
| / | Home | Accueil | 24/08/2026 |
| /projects/greycairn | Greycairn | Greycairn | 12/01/2026 |
| /news | News | Actualités | 24/08/2026 |
| /news/winter-drill-results | Winter drill results | Résultats du forage | 24/08/2026 |
| /contact | Contact | Contact |
The English edition of the drill release reads 24 August 2026. The sister page reads 24/08/2026. Social links and the news record are shared, so a correction is made once.
The language switch on the English site points at the sister path. It does not open a second product.