A single-page leave-behind for an exploration project or a fund, laid out again whenever the figures fall behind the current story.
Print & Page Layout
Mining and exploration
Productised service
Productised
Local/private
2026
The problem
The one-page summary has to be rebuilt whenever the resource figures or the fund story move on. A conference handout that starts as a Microsoft Word file often does not read clearly in print. So the sheet in people's hands can disagree with the deck.
What it does
The sheet is one page of location, key figures and a short story, filed beside the current deck. When a number changes, the page is rearranged so it still reads at a glance. The same file gives a print PDF and a screen PDF.
Outcomes
A one-page leave-behind matches the current deck.
A change in figures rearranges the page and needs no new design.
Print and screen PDFs come from the same layout.
Simplified mockup
Interactive preview with sample data. Nothing is sent to a server.
Fellside licence
Matches Q3 deck
CR
Calder RidgeExploration · Fellside licence
Q3 2026
Indicated resource1.82 Mt
Grade2.4 g/t
Contained metal141 koz
Fellside is an early-stage licence on the western fell edge. This leave-behind matches the current deck: location, three figures, and a short account of the quarter.
Restack from new figures
Grade, held
The Q4 deck leads with contained metal. Grade does not move, so only these two blocks are restacked.
CR
Calder RidgeExploration · Fellside licence
Q3 2026
Indicated resource1.82 Mt
Grade2.4 g/t
Contained metal141 koz
Fellside is an early-stage licence on the western fell edge. The sheet still leads with indicated resource, as in the Q3 deck.
Waiting for a restack
Hierarchy Restacked, not redrawn
Contained metal now spans the top of the page. Resource sits beside the map. Grade was left in place. The filed Q3 sheet is unchanged.
Print and screen
CR
Calder RidgeExploration · Fellside licence
Q3 2026
Indicated resource1.82 Mt
Grade2.4 g/t
Contained metal141 koz
Fellside is an early-stage licence on the western fell edge. The sheet still leads with indicated resource, as in the Q3 deck.
A4 landscape · crop marks · 3 mm bleed
Export from this same sheet
Quarter files Ready
File
Use
Fellside-fact-sheet-2026-Q4-print.pdf
Print, with crop marks
Fellside-fact-sheet-2026-Q4-screen.pdf
On-screen sharing
How it works
Start from the previous sheet or a Microsoft Word draft.
Place the logo, a map or photograph and the current figures.
Rearrange the page when a number changes so the key points still stand out.
Export a print PDF with crop marks and a screen PDF for sharing.
Pipeline
flowchart LR
A[Previous sheet] --> B[Current figures]
B --> C[Restack page]
C --> D[Print PDF]
C --> E[Screen PDF]