March rainfall at the Hartwell gauge was 112 mm, 18% above the ten-year mean. Marrow Brook stayed inside its banks on 81 of 90 days. Two amber alerts followed the storm on 14 March.
Hartwell works treated 42.6 Ml/d on average. Final chlorine sat between 0.4 and 0.8 mg/l on 97% of samples. Three turbidity spikes on 2 February cleared the same shift after a clarifier desludge.
Reported leakage for North Ward was 4.8 Ml/d, down 0.3 on the previous quarter. Eleven bursts were repaired, eight of them on cast-iron mains laid before 1960.
Reported leakage for North Ward was 4.8 Ml/d, down 0.3 on the previous quarter.
The Marrow trunk main replacement (3.2 km) is in week 6 of 14. Spend to date is £1.4 million against a £3.1 million authority.
- Load the saved index
- Propose the heading tree
- Append catchment
- Append treatment
- Save state and stop
| Document | Pages | Used by |
|---|---|---|
| Rainfall bulletin, Jan to Mar | 12 | Catchment |
| Marrow Brook level log | 18 | Catchment |
| Hartwell works daily sheets | 40 | Treatment |
| Chlorine residual exceptions | 6 | Treatment |
| North Ward leakage pack | 22 | Leakage |
| February burst log | 9 | Leakage |
| Customer contact themes | 14 | Contacts |
| Board extract, leakage repeat | 8 | Contacts |
| Marrow trunk main scheme note | 11 | Capital |
A later start reads this file and does not rewrite headings 1 and 2.
- 16:40 Catchment appended, two sources
- 16:41 Treatment appended, two sources
- 16:42 Stopped. Heading 3 not started
- Resume writes leakage, skips the repeat, then capital